Our Funding Timeline
Phase 1
Stage
Bootstrapping
Amount Invested
$200,000
Time Frame
2 YEAR
Period
May 2021 – May 2023.
Usage Of Funds:
- Company formation and Legal documentations.
- Purchase Acquisition of 30 Hectares of Land zoned for Farming and Industrial purposes.
- Partial Development of parts of the Acquired Land
- Temporary Factory Building setup.
- Purchase of Machinery, tanks and Equipment for processing.
- Logistics and Transportation cost for machineries.
- Raw Materials purchases.
- Payroll
- Branding, Marketing.
- Web developments.
- Exhibition expenses.
- Professional Consultations.
Phase 2: Current Phase
Proposed Use Of Funds:
- Purchase of Machinery, Raw Materials and Logistics Equipment needed to increase the capacity production and maximize the efficiency of our current operations.
- Add an Industrial Cracker and Separator machine to our operation. This addition will (a) increase productivity at our factory, (b) significantly decrease our cost of raw materials,(c) add more value chain products by the processing of the shells which would be considered a waste material from this process.
- Add an Industrial size Carbonization Machine and other machinery necessary to process the shells from our factory and convert them to Activated Carbon, as well as Charcoal Briquettes.
- Add a Standby Power Generator machine to enable constant productivity due to power outages.
- Acquire Logistics Equipment needed to aid in the transportation of raw materials from point of purchase to our factory site.
- Purchase raw materials needed to increase our production and boost profitability.
- Hire and train appropriate labor needed to implement the expected growth during this Phase.
Stage
Pre- Seed Round
Ask
$150,000
Tenure
18 Months
PREFERRED FUNDING OPTION
* RBF with a SAFE agreement.
* RBF – Revenue Based Financing.
Phase 3: Next Phase.
Stage
Seed Round
Ask
$2.5 Million USD
Preferred Funding Option
Convertible Note.
Proposed Use Of Funds:
- Setting up multiple cooling ponds to collect POME (Palm Oil Mill Effluent)
- Setting up multiple industrial size Bio -Digesters to convert waste from the POME Sedimentation to Bio- Gas. Converting the Bio- Gas into Bio-Methane and subsequently to CNG.
- Setting up and building filtration chambers where methane gas can be scrubbed and filtered before sending it to the storage tank facility.
- Building commercial size storage tanks where this methane gas can be stored in large quantity.
- Setting up a distribution channel to distribute the gas generated and stored from these processes. Distribution channels will include – distributing it to (a) power generating companies, (b) CNG Compression facility (c) electric plant to be used inside our farm.
- Setting up processing facility to manufacture our Bio-Fertilizers using Bio Slurry, Empty Palm fruit Bunches, and other Palm fruit waste materials.
- Setting up a processing facility with the addition of necessary machinery needed to manufacture engineered BIOMASS BLOCK our raw materials deemed as waste product
Phase 4: Future Phase
Proposed Use Of Funds:
- Further Expansion and Growth implementations from Phase 3.
- Setting up of a 10,000 Metric Ton Vegetable Oil refinery
- Setting up of a 5,000 Metric Tons Palm RBD De fractionating Refinery.
- Setting up of Animal feed processing plant using our byproducts.